Rechercher une page de manuel
globus_gram_protocol_job_signal
Langue: en
Version: 359798 (ubuntu - 24/10/10)
Section: 3 (Bibliothèques de fonctions)
Sommaire
NAME
GRAM Signals -Enumerations
enum globus_gram_protocol_job_signal_t { GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_CANCEL = 1, GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_SUSPEND = 2, GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_RESUME = 3, GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_PRIORITY = 4, GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_COMMIT_REQUEST = 5, GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_COMMIT_EXTEND = 6, GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_STDIO_UPDATE = 7, GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_STDIO_SIZE = 8, GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_STOP_MANAGER = 9, GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_COMMIT_END = 10 }
Detailed Description
Enumeration Type Documentation
enum globus_gram_protocol_job_signal_t
GRAM Signals.
Enumerator:
- GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_CANCEL
- Cancel a job.
- GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_SUSPEND
- Suspend a job.
- GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_RESUME
- Resume a previously suspended job.
- GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_PRIORITY
- Change the priority of a job.
- GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_COMMIT_REQUEST
- Signal the job manager to commence with a job submission if the job request was accompanied by the (two_state=yes) RSL attribute.
- GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_COMMIT_EXTEND
- Signal the job manager to wait an additional number of seconds (specified by an integer value string as the signal's argument) before timing out a two-phase job commit.
- GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_STDIO_UPDATE
- Signal the job manager to change the way it is currently handling standard output and/or standard error. The argument for this signal is an RSL containing new stdout, stderr, stdout_position, stderr_position, or remote_io_url relations.
- GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_STDIO_SIZE
- Signal the job manager to verify that streamed I/O has been completely received. The argument to this signal contains the number of bytes of stdout and stderr received, separated by a space. The reply to this signal will be a SUCCESS message if these matched the amount sent by the job manager. Otherwise, an error reply indicating GLOBUS_GRAM_PROTOCOL_ERROR_STDIO_SIZE is returned. If standard output and standard error are merged, only one number should be sent as an argument to this signal. An argument of -1 for either stream size indicates that the client is not interested in the size of that stream.
- GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_STOP_MANAGER
- Signal the job manager to stop managing the current job and terminate. The job continues to run as normal. The job manager will send a state change callback with the job status being FAILED and the error GLOBUS_GRAM_PROTOCOL_ERROR_JM_STOPPED.
- GLOBUS_GRAM_PROTOCOL_JOB_SIGNAL_COMMIT_END
- Signal the job manager to clean up after the completion of the job if the job RSL contained the (two-phase = yes) relation.
Author
Generated automatically by Doxygen for globus gram protocol from the source code.
Contenus ©2006-2024 Benjamin Poulain
Design ©2006-2024 Maxime Vantorre